Kitchen Remodeling Project 2007
Quick movie maker video of my kitchen remodel, set to the music of rocky. I did this project completely by myself and did it bacically in one week.
Duration : 0:3:11
Tagged with: 2007 • bay • bruce • cappuccino • dupont • kitchen • kraftmade • oak • pella • project • Quartz • Remodeling • window • zodiaq
Filed under: Kitchen Remodeling
Like this post? Subscribe to my RSS feed and get loads more!
The vast majority …
The vast majority of the work was done in one week. My camera battery died and I reset the wrong date in the camera by accident after charging it. The first wall came down in January – but only took about 4 hours. After the cabinets were set, I had to wait about 2 weeks for the countertops to be measured, cut and installed.
took more than one …
took more than one week
Knockout work. One …
Knockout work. One of the best uses of kitchen space I’ve seen is the type of wine rack design at paulallendesign,com. I have two of the small ones, one for reds and one for whites.
Another good video …
Another good video Jabman, really pumps me up. you wanna do my kitchen for me?!
thank you.
thank you.
great
great